{"id":32162,"date":"2021-04-07T09:13:05","date_gmt":"2021-04-07T07:13:05","guid":{"rendered":"https:\/\/www.electroline.com.cy\/additional-work-items-that-maybe-needed-when-installing-air-conditions\/"},"modified":"2021-04-07T09:13:05","modified_gmt":"2021-04-07T07:13:05","slug":"additional-work-items-that-maybe-needed-when-installing-air-conditions","status":"publish","type":"page","link":"https:\/\/electroline.cy\/campaigns\/additional-work-items-that-maybe-needed-when-installing-air-conditions\/","title":{"rendered":"ADDITIONAL WORK\/ITEMS THAT MAYBE NEEDED  WHEN INSTALLING AIR CONDITIONS"},"content":{"rendered":"<div class=\"ac-promo-text\">\n<p>In the event of additional work\/items during air condition installations, the additional charges<\/p>\n<\/div>\n<p>To the customer will be a follows:<br \/>\n\u2022Chemical cleaning of copper pipes with Nitrogen:<br \/>\n\u2022 If the copper pipe circuit has been left open &#8211; After removing old air conditions &#8211; If another type of refrigerant was used &#8211; If there is moisture in the copper pipe circuit.<br \/>\n\u2022 \u20ac20.00 per unit.<br \/>\n\u2022Removal of air condition (9000-24000BTU) &#8211; \u20ac20.00 per unit.<br \/>\n\u2022Removal of air condition and Chemical cleaning on pre-installed pipes &#8211; \u20ac50.00 each.<br \/>\n\u2022The installation includes trunking 16x16mm to the AC connection up to 3 meters.<br \/>\n\u2022The installation includes a 16mm pipe for the water drain up to 3 meters.<br \/>\n\u2022If the distance between the indoor and outdoor units is greater than 3 meters,<br \/>\n\u2022\u20ac18.00 per extra meter.<br \/>\n\u2022If PVC trunking to cover the pipes (100X50) is requested &#8211; \u20ac12.00 per meter.<br \/>\n\u2022If a heater switch is needed on an installed socket &#8211; \u20ac20.00 each.<br \/>\n&#8211; Additional new point with socket and PVC trunking &#8211; \u20ac35.00 each.<br \/>\n\u2022Installation of rubber\/plastic floor base for the outdoor unit if requested &#8211; \u20ac20.00 each.<br \/>\n\u2022Installation of metal wall bracket for the outdoor unit:<br \/>\n9000-12000BTU -\u20ac25.00 each<br \/>\n18000 &#8211; 24000BTU &#8211; \u20ac35.00 each.<br \/>\n\u2022Installation with EAC regulations (switch, Glands for cables) &#8211; \u20ac50.00 each.<br \/>\n-If armoured cable is needed &#8211; \u20ac3.00 per meter.<br \/>\n-Presence of technician during EAC inspection &#8211; \u20ac50.00.<br \/>\n\u2022The company does not take on, drilling holes on solid concrete walls, stone walls or on columns.<br \/>\n\u2022If a forklift\/lifting machinery is needed, it will be paid by the customer &#8211; \u20ac59.50 per hour.<\/p>\n<p>The above prices include VAT. 19%.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In order to be able to proceed with the purchase of the air conditioner, you must have read and accepted any additional Tasks that may arise during the Installation of the Air Conditioners.<\/p>\n","protected":false},"author":1211,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-32162","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/electroline.cy\/campaigns\/wp-json\/wp\/v2\/pages\/32162","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/electroline.cy\/campaigns\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/electroline.cy\/campaigns\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/electroline.cy\/campaigns\/wp-json\/wp\/v2\/users\/1211"}],"replies":[{"embeddable":true,"href":"https:\/\/electroline.cy\/campaigns\/wp-json\/wp\/v2\/comments?post=32162"}],"version-history":[{"count":0,"href":"https:\/\/electroline.cy\/campaigns\/wp-json\/wp\/v2\/pages\/32162\/revisions"}],"wp:attachment":[{"href":"https:\/\/electroline.cy\/campaigns\/wp-json\/wp\/v2\/media?parent=32162"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}